CCR Landfill - LRS

Location Restrictions

  1. Unstable Areas 

Design Criteria

  1. New Unit Design Certification (N/A)
  2. New Unit construction Certification (N/A)

Operating Criteria

  1. CCR Fugitive Dust Plan
  2. CCR Fugitive Dust Plan Annual Report
    1. 2016 report
    2. 2017 report
    3. 2018 report
    4. 2019 report
    5. 2020 report
  3. Initial/Periodic Run-on and Run-off Control System Plans
  4. Documentation of Corrective Measures Resulting From QPE Annual Inspection of Landfill or Surface Impoundment
  5. QPE Annual Inspection Reports for CCR Landfill
    1. 2015 report
    2. 2016 report
    3. 2017 report
    4. 2018 report
    5. 2019 report

Groundwater Monitoring and Corrective Action

  1. Annual Groundwater Monitoring and Corrective Action Report
    1. 2017 report
    2. 2018 report
    3. 2019 report
  2. Groundwater Monitoring System and Statistical Method Certification
  3. Assessment Monitoring Notification

Closure and Post-Closure Care

  1. Written Closure Plan
  2. Written Post-Closure Plan
  3. Notification of Completion of Post-Closure Care