Location Restrictions
- Placement Above Uppermost Aquifer
- Wetlands
- Fault Areas
- Seismic Impact Zones
- Unstable Areas
- Unstable Areas - Existing CCR Landfill
Design Criteria
- Landfill Lateral Expansion Design Certification
- Landfill Lateral Expansion Construction Certification
- Landfill Lateral Expansion Construction Certification Cell 2A and Cell 2B
Operating Criteria
- CCR Fugitive Dust Plan
- CCR Fugitive Dust Plan Annual Report
- Initial/Periodic Run-on and Run-off Control System Plans
- Documentation of Corrective Measures Resulting From QPE Annual Inspection of Landfill or Surface Impoundment
- QPE Annual Inspection Reports for CCR Landfill
Groundwater Monitoring and Corrective Action
- Annual Groundwater Monitoring and Corrective Action Report
- Groundwater Monitoring System and Statistical Method Certification
Closure and Post-Closure Care
- Written Closure Plan
- Written Post-Closure Plan
- Notification of Completion of Post-Closure Care
Archived items